
Red Lion-Five Points Road Trail
This new roadside walking trail features a maintenance free fiberglass deck in a custom color and durable beam construction.
Cincinnati, OH
Clermont County and Axcess have worked together on multiple bridges in their park districts, and this bridge at Wilson Nature Preserve was the first to be installed. This bridge is located about half of a mile down the trail and crosses over a runoff to the East Fork Little Miami River. The bridge solution is one of the most common and budget friendly options that Axcess provides.
The bridge foundations use helical piles that weathering steel beams bolt to directly. Treated wood planks are attached to the steel beams and an aluminum railing install completes the bridge. This solution requires little maintenance over the life span of the bridge, and anything that needs to be replaced can be done in little time without needing to close the trail.
BRIDGE SPAN: 23 feet
BRIDGE WIDTH: 8 feet
BRIDGE WEIGHT: 3,000 lbs
This new roadside walking trail features a maintenance free fiberglass deck in a custom color and durable beam construction.
Connecting a new walking path in the Jackson Grant development, this composite deck bridge matches the custom style of the homes surrounding it.
With repairs and improved stability, a homeowner’s bridge will be able to withstand the forces of flooding water and debris for years to come.
This project involved repurposing a railroad bridge with FRP decking and custom railing at the end of the bike and hike trail system in the town of Delphi, Indiana.
With repairs and improved stability, a homeowner’s bridge will be able to withstand the forces of flooding water and debris for years to come.