Clermont County Wilson Nature Preserve
The first of multiple projects that Axcess and Clermont County Parks have been able to work together on installing.
Cincinnati, OH
The Jackson Grant community has been working on an expansive walking path for the past several years as it continues to build homes in the development. This bridge was paired with the Elliot’s Creek bridge project to connect walking paths over creeks throughout the Jackson Grant housing development. This Williams Creek bridge is special in that it uses a single FRP panel as its walkway instead of several planks. This allowed for the bridge to be preassembled at the manufacturer’s warehouse and shipped to site ready to be set in place.
The bridge used concrete abutments that were poured and set by Axcess before the whole bridge was set in place. Additionally, Rip Rap was placed under each abutment to prevent erosion. The FRP panels and weathered steel will need no maintenance over the life of the bridge. The bridge was finished with attaching wood curbs and aluminum railing and was able to be completed within a few weeks.
BRIDGE SPAN: 32 feet
BRIDGE WIDTH: 9 feet
BRIDGE WEIGHT: 5,000 lbs
The first of multiple projects that Axcess and Clermont County Parks have been able to work together on installing.
See how a local park district in Ohio used a truss bridge and solid surface fiberglass decking to replace a deteriorated wooden bridge.
A new Ohio apartment complex needed a pedestrian bridge for it’s walking trails that was maintenance free and affordable.
Johnson Nature Preserve is in a northeast suburb of Cincinnati that has a beautiful walking trail through the park.
The first of multiple projects that Axcess and Clermont County Parks have been able to work together on installing.